Case overview · Synthetic example

Office decisions: move or adjust?

Slow payments and interrupted meetings can make an office feel unsuitable. Before making a large move, this example separates two questions that may have different causes.

The question and provisional answer

All people, amounts and events on this page are synthetic. It is not an anonymised real client case and there is no achieved outcome.

The current evidence does not justify a move. Clarify payment conditions and room use first, then compare the cost of a limited change with a move. This is a provisional position subject to better evidence.

What the records show

The sample lists 100 units of payment items: 50 overdue, 30 not yet due and 20 awaiting acceptance. Ten of the overdue units are disputed. The list is not an accounting receivables statement. Treating all 100 as overdue would lead to the wrong next step.

Four of six illustrative meetings were interrupted. This is a reason to inspect circulation and scheduling, not proof that the room caused payment problems.

Where traditional analysis belongs

A Xuan Kong analysis needs verified orientation, period and chart rules. A Zi Wei analysis needs the person’s birth inputs; a Qi Men reading needs a defined question and recorded chart time. These inputs are not supplied in this example, so no precise chart interpretation is claimed.

Traditional interpretation can frame questions to explore. Contract records, operating data and observation determine what can be asserted as fact and which actions are feasible.

Three options worth comparing

Stay temporarily
Keep the office while checking essential records; avoid a premature commitment.
Limited trial
Separate deliveries from meetings and assign payment follow-up. Keep costs bounded and protect exits.
Move later
Only after verifying operating needs, the cost comparison and professional requirements. A traditional interpretation alone is insufficient.

What would change the view

If interruptions persist, reassess the room-use hypothesis. If acceptance improves but cash does not arrive, examine customer-side conditions rather than attributing the whole issue to space. Track adverse effects, comparable meeting counts and the original overdue items separately.

No improvement is guaranteed within 30, 60 or 90 days. A review date is an agreed checkpoint, not a prediction. There are no follow-up results to report in this synthetic case.

Three Reproducible Worked Examples

Fixed inputs, chart evidence, counterfactuals and practical checks for Ziwei, Qimen and date selection. Synthetic teaching examples with downloadable records and repeat calculations.

Three Reproducible Worked Examples